Pennoni completed the design, NPDES permitting of the WWTP outfall and construction stormwater management, bidding services, and construction administration for the upgrade and expansion of the STP from 2.5 MGD to 4.5 MGD average flow. The system is designed to handle a 12.5 MGD peak. Equalization was included in the design to handle weekend and summer peak organic flows. We completed PA DEP Water Quality and Water Management permitting, completed water quality monitoring, and obtained a DRBC docket and PADEP stream encroachment permit. We completed the site survey and land development plans for acquiring the adjacent parcel and for consolidating the property through land swaps with the adjacent property owner.