Silverbrook Sewage Pumping Station Upgrades

Silverbrook Sewage Pumping Station Upgrades

Pennoni was responsible for the evaluation and upgrade of an existing 1,200 gpm sewage 30 HP pumping station. Pennoni provided  design, bidding, and construction administration services. Prior to final design, a hydraulic analysis and field testing of the pumping station and force main was completed to determine the design discharge flow and pressure. Conceptual design was completed to determine the most cost-effective layout for the new pumps. After concurrence with the City on the new layout, final design was completed. The upgrades included the replacement of existing pumps with more efficient dry pit submersible non-clog pumps, new discharge piping for better operator access and maintenance, repainting of the piping and drywell, and electrical upgrades to the controls.