SR 0029 over Silver Lake Creek Design-Build

SR 0029 over Silver Lake Creek Design-Build

Pennoni prepared the final bridge, roadway, MPT, temporary signal, E&S pollution control, and right-of-way plans as part of the Design-Build replacement of a single-span steel stringer bridge. The new structure is a single-span prestressed concrete spread box beam bridge (47’-0” span length) supported by reinforced concrete cantilever abutments with a 94’-0” wingwall extension.