Marina/Dock Rehabilitation Statewide for the Ohio Deptment of Natural Resources

Marina/Dock Rehabilitation Statewide for the Ohio Deptment o...

Under this contract, Pennoni provided engineering services to rehabilitate the marinas at five state parks in southern Ohio. Our work involved the preparation of a Preliminary Design Report (PDR) to define the magnitude of the marina program. A draft PDR was prepared for each site and included the preliminary investigation, the assessment of the existing facilities including a boat inventory and existing facility inventory, conceptual drawings and a preliminary cost estimate. The preliminary investigation involved field survey/mapping, geotechnical investigation and an ecological determination. A final PDR for each site consisted of the layout the proposed improvements, discussion on the proposed improvements and preliminary cost estimate.